Product introduction

Gold dredger, also known as gold dredger, is a water combined plant integrating mining and beneficiation operations. It is a placer gold mining equipment. It includes excavation system, beneficiation and water supply system, waste ore and tailings disposal system, deck machinery, hull, power support, power and other basic systems.


Classification of gold dredgers

In terms of beneficiation process, gold dredgers are divided into fixed chute, belt chute, drum chute, self unloading fixed chute, water jacket centrifuge and circular jig. In terms of mining capacity, gold dredgers are divided into 15 l, 25 L, 40 L, 50 L, 100 L, 150 l, 200 L, 250 L and 300 L.


Parameters of gold dredger

1. The floating double body structure is 55m long, 2.1m wide and 1.25m high. The bottom plate and side plate are made of 6mm steel plate, the panel is made of 4mm anti sliding plate, the internal spacing of the floating body is 60mm, the groove copper and angle steel double-layer framework are welded, the rust prevention is treated with anti rust oil, and the gold dredger is used

2. 145 buckets are equipped. The bucket is a square bucket with a volume of 0.06 m3. The bottom plate of the bucket is made of 10 m steel plate, the coaming is made of 6mm steel plate, and the bucket lip is made of 15mm manganese steel

3. The hard strip is made of ordinary steel, and the shop part is treated with 46 steel high frequency heat treatment (Note: the part of the title book can be replaced). The silicon strip is 700mm long, 00mm high and 40mm high..

4. The main reducer is equipped with 1 set of 1000 type, 3 sets of 250 type and 2 sets of 350 type.

5. The power is equipped with one 55kW motor, one 22KW winch and two 5.5kW water pumps

6. The main frame is 6m high and adopts 162 channel steel,

7. Sand and gravel are screened by new division, 1m wide and 1.5m long, and welded with 22# manganese steel * 10# track steel.

8. The sand digging Dazhi is 50m long and is made of 9# angle steel. The bucket shaft is made of 45# steel with a diameter of 60mm. It adopts 511 bearing and 311 tile box with a spacing of 1.1m.

9. One Longmen fruit, welded with 163 trough pot. Diameter 22# copper wire rope is used as the steel wire rope for taking off and landing sand excavation

10. For sand excavation, the water quadrangle wheel and underwater pentagonal wheel are used. The underwater pentagonal wheel is made of 25 millimetre steel plate. The underwater pentagonal wheel shaft is made of 458 steel with a diameter of 150 mm. The underwater pentagonal wheel seal is double sealed. The quadrangle wheel is made of 15 mm steel plate, and the quadrangle wheel shaft is made of 180 millimetre 45# steel

11. The pin adopts high frequency heat treatment of 45 steel with a diameter of 28 mm.

12. There are two temperature tanks, with a length of 6m and a diameter of 1m. The temperature tank adopts Japanese sanmanzhi gold blanket

13. Zizi trough is used for sand tailing, and Shike hanging tail temperature trough is used.


The sand gold is mainly concentrated in the sand stone mixed layer of the bottom riverbed. The sand stone and gold shall be washed and sub sold through multiple procedures. The main gold washing tool is the gold boat. Runjin ship has been professionally designed. The large Haijin ship is also specially equipped with a sand gold automatic cleaning device, which can directly reach 80% purity.